Enel wins second tender in Brazil in one week, to build 1 GW of renewable

20171227

Enel through its Brazilian renewables subsidiary Enel Green Power Brasil (EGPB), has been awarded the right to sign 20-year power supply contracts in the country with three wind projects for 618 MW of new capacity following the public tender organised by the Brazilian federal government via the country’s energy regulator ANEEL. The Enel Group is expected to invest approximately 750 million US dollars in the construction of the three plants, in line with the investment set out in its current Strategic Plan. The Enel Group was awarded power supply contracts for more renewable capacity than any other participant in today’s tender, after being awarded contracts for 388 MW1 of solar capacity, more than any solar bidder, in the recent Brazilian A-4 renewables tender. The two awards this week are equivalent to an aggregate new capacity of more than 1 GW and a total investment of approximately 1 billion US dollars. “Enel Green Power has had another record year and these two wins this week in Brazil provide us with good momentum going into 2018. In Brazil specifically, in 2017 we have completed the construction of almost 1 GW of wind and solar plants. The new renewable capacity assigned this week will allow us to further increase our current renewables footprint in the country, thus reinforcing our leadership in this field,” said Antonio Cammisecra, head of Enel Green Power. Each wind farm is supported by 20-year power supply contracts, which provide for the sale of specified volumes of energy generated by the plant to a pool of distribution companies operating in the Brazilian regulated market. The wind farms, which will be built in the north-eastern Brazilian States of Piauí and Bahia, are expected to start operation in early 2023. The projects, once fully up-and-running, will be able to generate approximately 3 TWh of renewable energy each year. The 510 MW Lagoa do Barro wind farm will be built in the Lagoa do Barro do Piauí, Queimada Nova and Dom Inocêncio municipalities, in the State of Piauí. Once fully operational, the plant is expected to generate nearly 2,400 GWh of renewable energy each year. The 78 MW Morro do Chapéu II wind farm will be built in the Morro do Chapéu municipality, in the State of Bahia. The plant is expected to generate nearly 380 GWh of renewable energy each year. The plant is an extension of Enel’s 172 MW Morro do Chapéu Sul wind farm, with which it will share the same connection infrastructure. The 30 MW extension of Enel’s already operational 180 MW Delfina wind farm will be located in the Campo Formoso municipality, in the State of Bahia. The new facility is expected to generate annually more than 160 GWh of renewable energy. In Brazil, the Enel Group, through its subsidiaries EGPB and Enel Brasil, has a total installed renewable capacity of nearly 2,660 MW, of which 670 MW from wind power, 716 MW from solar PV and 1,270 MW from hydropower, as well as close to 172 MW of wind and 103 MW of solar capacity currently under construction.

Ист.: Energynomics, Ссылка: http://www.energynomics.ro/en/...
Темы:Энергетика, Транснацики,

Предыдущие:

 20171227 Mikhail Fridman nears stake in North Sea gasfield

Ист.:

Russian billionaire Mikhail Fridman is on course to become part-owner of a UK gasfield two years after he was ordered by the British government to sell his North Sea assets. Mr Fridman would acquire an interest in the Wingate gas platform off the east coast of England as part of a proposed merger between DEA, an energy company he controls, and Wintershall...
Мета: Mikhail Fridman, UK, DEA, LetterOne, BASF, John Browne, Темы: Энергетика, Транснацики, Будущее, Россия,


 20180103 Sanctioned Russian gas shipment will not enter UK network

Ист.:

When a tanker full of Russian gas docked at the Isle of Grain import terminal in Kent on Thursday night, as Britain experienced its lowest temperatures of the year, it was greeted as a propaganda coup for President Vladimir Putin. “Feeling cold? Help is on the way,” crowed the Russian embassy in London on Twitter, to mark the arrival of the first ship...
Мета: London, LNG, Yamal, Novatek, UKOOG, Ken Cronin, Темы: Энергетика, Транснацики, Война,


 20180103 Water utilities – engagement with gamification

Ист.:

Customer engagement is the perennial challenge for utilities – and surprisingly perhaps, it is more challenging for water utilities than for electric utilities. This is the view of Piero Fraternali, Deputy Director of the Electronics, Information and Bioengineering department at the Politecnico di Milano, who led several work packages in the EU FP7 supp...
Мета: Piero Fraternali, Politecnico di Milano, smartH2O, Penny, enCOMPASS, Темы: Энергетика, Транснацики,


По этой же теме:


 20171010 China: dena certifies six new energy-efficient buildings

Ист.:

Pilot projects for energy efficiency in nurseries, office buildings and residential buildings / 70 per cent lower energy consumption than in comparable new buildings The German Energy Agency (dena) has certified six new building projects in China with the highest energy efficiency class A. The buildings consume around 70 per cent less energy than the aver...
Мета: German Energy Agency, China, Center of Science and Technology of Construction, Темы: Энергетика,


 20171103 Every bit counts – Toward an electrified planet

Ист.:

Every bit counts – Toward an electrified planet Since the 2015 G7 summit in Elmau in southern Germany, the world has focused on a common goal: to turn away from fossil energy in favor of electricity as a universal energy source, with the ambition of achieving complete decarbonization by the year 2100. This presents all economies with tremendous chall...
Мета: G7 summit, 3D Model of Energy, Sustainable Energy for All, TenneT, Siemens, Темы: Энергетика, Социум, Будущее,


Следующие:


 20171010 China: dena certifies six new energy-efficient buildings

Ист.:

Pilot projects for energy efficiency in nurseries, office buildings and residential buildings / 70 per cent lower energy consumption than in comparable new buildings The German Energy Agency (dena) has certified six new building projects in China with the highest energy efficiency class A. The buildings consume around 70 per cent less energy than the aver...
Мета: German Energy Agency, China, Center of Science and Technology of Construction, Темы: Энергетика,


 20171103 Every bit counts – Toward an electrified planet

Ист.:

Every bit counts – Toward an electrified planet Since the 2015 G7 summit in Elmau in southern Germany, the world has focused on a common goal: to turn away from fossil energy in favor of electricity as a universal energy source, with the ambition of achieving complete decarbonization by the year 2100. This presents all economies with tremendous chall...
Мета: G7 summit, 3D Model of Energy, Sustainable Energy for All, TenneT, Siemens, Темы: Энергетика, Социум, Будущее,